Rush to the race

Jan. 1, 2011
Jared Beyer and Beyer Racing are gearing up for their second season on the Grand Am Rolex Sports Car Series racing circuit with the help of sponsor Rush Truck Centers, a division of Rush Enterprises. The Grand Am race car driven by Jared is a light, low-slung affair with a carbon fiber body over a steel frame chassis. The engine cranks out 650 hp. and speeds in excess of 200 mph. That kind of power

Jared Beyer and Beyer Racing are gearing up for their second season on the Grand Am Rolex Sports Car Series racing circuit with the help of sponsor Rush Truck Centers, a division of Rush Enterprises.

The Grand Am race car driven by Jared is a light, low-slung affair with a carbon fiber body over a steel frame chassis. The engine cranks out 650 hp. and speeds in excess of 200 mph. That kind of power generates tremendous heat — the temperature around the driver's seat typically reaches 180 deg. F during a race, Beyer told our intrepid reporter.

Voice your opinion!

To join the conversation, and become an exclusive member of FleetOwner, create an account today!

Sponsored Recommendations

Report: The 2024 State of Heavy-Duty Repair

From capitalizing on the latest revenue trends to implementing strategic financial planning—this report serves as a roadmap for navigating the challenges and opportunities of ...

Build a Tolling Program to Manage Toll Fees and Risks

Fleets looking to effectively manage their operational costs should consider their tolling costs. Download the PrePass whitepaper, “Build a Tolling Program to Manage Toll Fees...

Reducing CSA Violations & Increasing Safety With Advanced Trailer Telematics

Keep the roads safer with advanced trailer telematics. In this whitepaper, see how you can gain insights that lead to increased safety and reduced roadside incidents—keeping drivers...

80% Fewer Towable Accidents - 10 Key Strategies

After installing grille guards on all of their Class 8 trucks, a major Midwest fleet reported they had reduced their number of towable accidents by 80% post installation – including...