• Daimler opens new Oregon test facility

    Company says test track will speed develop of new products, technology
    May 19, 2017
    3 min read
    A Freightliner Cascadia takes a lap around the new test track Photo Kevin JonesFleet Owner

    MADRAS, OR. Daimler Trucks North America (DTNA) officially opened its new test facility here May 18, which the company said will speed the development of new vehicles and deployment of advanced technologies.

    Known as the High Desert Proving Grounds, the facility is 120 miles from DTNA’s headquarters in Portland, OR. It took one year to construct and represents a major expansion of a limited-use facility the company has maintained for more than 30 years. Previously, DTNA utilized a shared facility in Indiana, a lengthy travel commitment from its Pacific Northwest home.

    “This is truly a place for us to bring products faster, quicker . . . and better than our competitors can ever do,” said Roger Nielsen, president and CEO of Daimler Trucks North America.

    The opening was Nielsen’s first media event since taking over for Martin Daum on April 1. Daum was elevated to president of Daimler’s global commercial vehicles unit following the departure of Wolfgang Bernhard.

    “This is an engineering dream,” said Wilfried Achenbach, DTNA’s senior vice president of engineering and technology.

    He said the short drive from the company’s headquarters will allow engineers “to come here to modify software and get into the truck and try it out,” all in one day.

    Wilfried Achenbach, DTNA’s senior vice president of engineering and technology (Kevin Jones/Fleet Owner)

    In an interview with Fleet Owner, he said the distance between Oregon and the test facility in Indiana created a disconnect making it hard to keep engineering teams engaged. The new facility also eliminates the need to spend several days moving test vehicles long distances.

    DTNA said it invested $18.7 million into the 87-acre facility, which will house about 40 full-time engineers, technicians and truck drivers, apart from existing employees based at other locations. Last year, it opened a new $150 million headquarters in Portland.

    The test track in Madras is 3.5 miles of engineered surfaces, allowing DTNA to simulate a typical vehicle’s full service life in about six months. The track features nine concrete test events comprised of 379 precast panels. 


    “This replicates any road surface you can find around the world,” Achenbach said.

    DTNA said the facility will improve the durability and fuel economy of its vehicles, while also more rapidly advancing platooning and autonomous technologies.

    Daimler has a similar test facility in Germany, and is constructing one in Brazil.

    “Bumps are bumps, wherever you go,” Achenbach said in explaining the company’s plans to share test results between the locations.

    Achenbach also noted Madras’s climate – hot in the summer and cold (but not too cold) in winter – makes it an ideal location for testing.

    Additionally, the route from Portland to Madras also provides real world validation by including portions on the interstate, rural roads and mountainous terrain through the Mount Hood pass. 

    About the Author

    Neil Abt

    Neil Abt is a former FleetOwner editor who wrote for the publication from 2017 to 2020. He was editorial director from 2018 to 2020.

    Voice your opinion!

    To join the conversation, and become an exclusive member of FleetOwner, create an account today!

    Sign up for our free eNewsletters

    Latest from Equipment

    J.B. Poindexter & Co.
    DCBM brand ambulances
    Parent company of work truck upfitting giants Reading Truck and Morgan Olson expands into the emergency vehicle market with the addition of one of North America’s largest ambulance...
    Kenworth
    2021 Kenworth W900L
    The Kenworth assembly plant in Chillicothe, Ohio, held the company's annual truck parade in the city's downtown, paying homage to the storied W900 model.
    Clarios
    Clarios plans U.S. supercapacitor production campus to revolutionize energy storage solutions
    Clarios is assessing site options across the states where it operates and expects to announce a location later this calendar year.